Have you looked at your pool lately and felt it needs a change? Maybe a few tiles are cracked, your yard outdated or the surface feels rough on your feet. A pool remodel can make your backyard feel new again.
As you consider a pool remodel, it is helpful to know how long it will take.
Renovation time frames are completely dependent on the scope of work. Simple renovations can be as quick as 8 weeks and more complex renovations can be 20+ weeks. Knowing the timelines can help you better understand the length of time a remodel will take.
Let’s walk through each step so you know what to expect.
Why Do People Remodel a Pool?
There are many reasons to remodel a pool. Some are for looks. Others improve safety, comfort, or efficiency.
Homeowners often choose to:
- Refinish the inside surface
- Replace old tile
- Update the coping
- Install a new deck
- Add LED lighting
- Upgrade equipment
- Add a spa or water feature
Every pool is different. Your timeline depends on the upgrades you choose.
Steps to Remodel Your Pool
Every company has its own process. Most pool remodeling projects follow the same general steps.

Step 1: Inspection and Planning
The first step is a full inspection. A pool expert visits your home to check the structure, plumbing, and equipment. They look for cracks, worn plaster, and loose tile.
This helps them understand what needs repair before work begins.
Next comes the design plan. You sit down with your contractor and choose tile, finishes, and any new pool features you want.
This phase usually takes one to two weeks depending on how quickly decisions are made.
Step 2: Permits and Approvals
Before construction starts, permits are required. Cities, counties, and homeowner associations all have rules for pool construction and renovations.
Your contractor submits the plans to the local building office. The city reviews plumbing, electrical, and safety details before approving the project.
This process typically takes six to eight weeks . Work cannot begin until permits are approved.
Step 3: Draining the Pool
Now the project begins.
The first step involves draining the pool. Generally a standard sump pump is used, the average pool holds around 10,000 gallons, so draining can take several hours.
Once empty, the crew prepares the space for work. It helps to clear patio furniture ahead of time so equipment can be moved safely.
This stage usually takes about 2 to 4 days.
Step 4: Structural Repairs
With the water removed, the entire surface is visible. This allows the crew to spot cracks or weak areas that were not easy to see before.
Loose plaster is chipped away and damaged sections are repaired with strong bonding materials.
This preparation of the surface is important. It helps the new finish attach properly and last longer.
Depending on the condition of the pool, this step may take several days.
Step 5: Plumbing and Equipment Upgrades
Once the structure is solid, upgrades can begin.
Because the pool is empty, plumbing and electrical systems are easier to access. This makes it the best time to upgrade equipment.
Common pool equipment upgrades include:
- Energy efficient pumps
- New filters
- Saltwater systems
- Automation controls
- Updated lighting
Basic installations can take up to a week . Larger system upgrades may take longer. This stage generally involves multiple inspections for quality assurance which contributes to the time frame.

Step 6: Tile, Coping, and Deck Work
This is when visual changes really start to show. Waterline tile is often placed to add color and style to your pool. New coping is installed along the pool edge.
If the deck is being updated, pavers, travertine or decorative concrete are installed around the pool.
This stage often takes one to two weeks. Rain or storms can extend the timeline since most of this work is outdoors.
Step 7: Resurfacing the Interior
Resurfacing is one of the most important parts of the project. The crew applies plaster or pebble material to the walls and floor. The surface must be rough to allow for proper bonding and uniform what? for the best results.
After application, the material must cure. Weather and pool size can affect how long this takes.
This step usually lasts up to 30 days
Step 8: Refilling and Balancing
The plaster cures with water in the pool so the curing process occurs after the pool is filled. A garden hose is commonly used, which can take more than a day. Some companies offer water truck services to speed up the process. Ask your contractor what options are available.
Once filled, the water is balanced with the proper chemicals. This protects the new surface and keeps swimmers safe.
A final inspection may also be required before the project is complete.
What Can Delay a Pool Remodel?
Even with careful planning, delays can happen.
Common causes include:
- Slow permit approvals
- Inspection scheduling delays
- Heavy rain or storms
- Hidden plumbing damage
- Unexpected structural cracks
Addressing problems the right way protects your investment. Taking the extra time now can prevent costly repairs later.

How to Plan Your Timeline
If you want your pool ready for summer, plan ahead. Starting in cooler months such as January through April is often a smart choice.
Talk with your contractor about the full schedule before work begins. Ask how delays are handled and what to expect each week.
Clear communication helps keep your project on track.
Orlando Pool Remodels from Premier Pools
Pool remodeling is a major project, but the results are worth it. Renovation scope of work can vary significantly. Very rarely do any of our jobs finish in less than 8 weeks and larger renovation projects can take 20+ weeks. Each step plays an important role in the final outcome.
At Premier Pools, we do not rush the process. We focus on quality work and clear communication from start to finish.
When the project is complete and the dust settles, the time spent will have been well worth it. The water is clear, your pool surface is smooth, the tile shines and your backyard feels new again. Contact Premier Pools today for a free estimate on your Orlando pool remodel.